Past and Current Projects
Realizing Energy Savings and Decarbonization

QuikTrip Distribution Center
Upgrades include a 2 MW dc solar system, with 4,586 450-Watt bifacial solar modules, resulting in 44,004 metric tons of atmospheric CO2 equivalent (MTCO2e) offset.
Solar
M&V
Tolleson, AZ
battery
backup
LED
Metric tons Co2 reduction
44,004
Coca Cola Distribution Visitor Center
Estimated lifetime savings of $445,642. Achieves net zero by offsetting 100% of electric bill. Includes 120.6 kW rooftop solar system.
Solar
M&V
HOUSTON, TX
battery
backup
Estimated lifetime savings
$1.8 M
Metric tons Co2 reduction
19,181
Prominic
2MW solar microgrid producing 4,500 MWh annually.

Rantoul, IL
4,500 MWh
Annual Production
Solar
battery
backup
M&V
micro-
grid
Rooftop and Ground Solar Generation System
2.08 MW dc / 1.74 MW dc Rooftop and Ground system

wilson, NC
2.08/1.74 MWh
Rooftop and Ground System
Solar
M&V
HVAC
QuikTrip Distribution Center
2 MW fuel generator with custom sound-attenuated enclosure and 5,000 gallon underground fuel tank. Emergency backup power and load curtailment opportunities.
M&V
Belton, MO
battery
backup
Includes
2MW
Fuel Generator
Municipal Facility Upgrades
Multiple upgrades to several County facility buildings including courthouses, administrative buildings, public works, libraries
LEON COUNTY, FL
in facility upgrades
$17M
leadership case study
PE, CEM, LEED
VP, Project Engineering
Justin brings over 25 years of in the building performance and energy space, having managed numerous energy service projects with concentrations in Lighting, HVAC, DDC Automation, and Water/Wastewater.

Justin Forand
HVAC
LED
IOT
water
Ritz-Carton Energy Audit Program
Energy audit program to target low-cost, capital, and behavioral recommendations for energy use reduction resulting in 9.9% reduction in energy spending and $2.7M in savings
MARRIOT INTERNATIONAL
reduction in energy spending
9.9 %
savings
$2.7M
AUDIT
M&V
leadership case study
PE, CEM, BCxP, LEED AP
Energy Engineering Advisor
Jessica brings 25+ years of purpose-driven engineering solutions with projects like these.
Jessica Lorentz
Epson Portland
831 kW solar system, offsetting 30% of estimated lifetime carbon emissions, equivalent to 4,221 metric tons of atmospheric CO2.
Solar
M&V
HILLSBORO, OR
Metric tons Co2 reduction
4,221
CARBON
OFFSETS
taxes & rebates
US Marine Core Solar Facility

Design and construction of a 256 kW solar energy system with the US government, resulting in 2176475 kWh energy savings and reduction of 2176 metric tons CO2e.
Metric tons Co2 reduction
2,176
leadership case study
MBA, PMP
Senior Project Manager
Jeremie brings over 17 years of Solar Energy engineering and management experience with projects like these.
Jeremie Branton
Solar
Municipal Facility Upgrades
Municipal Water Meter replacement
for entire city from a drive-by system to a full cellular Advanced Metering Infrastructure (AMI) system
oakland park, fl

estimated savings over 15 years
$15M
leadership case study
PE, CEM, LEED
VP, Project Engineering
Justin brings over 25 years of in the building performance and energy space, having managed numerous energy service projects with concentrations in Lighting, HVAC, DDC Automation, and Water/Wastewater.

Justin Forand
IOT
water
King Solar Farm
Solar farm totaling 259 GWh

Solar
M&V
SOUTH TEXAS
259 GWh
Solar Power Facility
QuikTrip C-Stores
250-300 kW solar systems that offset 44-75% of annual electricity consumption, resulting in an average 5,004 metric tons of atmospheric CO2 equivalent (MTCO2e) offset for each location.
M&V
ARIZONA
CARBON
OFFSETS
taxes & rebates
Solar
Average metric tons Co2 reduction
per location
5,800
TRUSTED ADVISORS
We work with you to build customized energy solutions
that support your business and sustainability goals.
Made on
Tilda